Projects DUC Marine Group
DUC Marine Group has 35 years of experience with a wide range of projects across the globe. Read about them here:
DUC Marine Group has 35 years of experience with a wide range of projects across the globe. Read about them here:
WRECK REMOVAL CONTAINER CRANE, IJmuiden, The Netherlands
SEAFLOOR CLEARANCE AND DEBRIS REMOVAL – Flushing, Amsterdam, Rotterdam
WALL THICKNESS MEASUREMENTS – Georgia
REPLACING OIL PIPELINE – Israel
REMOVAL OF GROUT BLOCKS FROM A DIAPHRAGM WALL – France
AQUATIC CENTRE – London UK
INSTALLATION OF A SINGLE-POINT MOORING (SPM) BUOY – Romania
28.4 KM GROUT LINES REMOVED – North East of Heligoland
MAKING A CONDENSER PIT WATERTIGHT, Tunisia, Middle East
INSTALLATION COOLING WATER INLETS POWER PLANT, Rotterdam, The Netherlands
MAINTENANCE IRON ORE JETTY, Mauritania
INSPECT, TEST AND REPLACE ANODES, Port of Rotterdam, Netherlands
PILE ENCAPSULATION SYSTEM, Port of Rotterdam, The Netherlands
SALVAGE OF LOST SUSPENSION BRIDGE PARTS, IJmuiden Approach Channel, The Netherlands
BURIAL OF A CABLE LOOP, Windpark DanTysk, German Economic Zone.
INSTALLATION BOATLANDING – Helgoland, Germany
SALVAGE OF BROKEN SPUDLEG, Niger Delta, Africa
Office Address
Marsdiep 23
8321 MC Urk
The Netherlands
PO Box Address
PO Box 123
8320 AC Urk
The Netherlands
© Copyright – DUC Marine Group.